Analisis Risiko Keterlambatan Proyek Pada Pembangunan Revitalisasi Gedung Pasar Rakyat Leles Garut Tahap III

Authors

  • Indriani Isabela Institut Teknologi Garut
  • Ganjar J Johari Institut Teknologi Garut

DOI:

https://doi.org/10.59581/jkts-widyakarya.v1i4.1182

Keywords:

Impact and Causes of Delay, FTA Method, ETA Method

Abstract

The Revitalization Development of the Leles People's Market Building Phase III is a government development project overseen by the Garut Regency DISPERINDAG. The construction of this market building began in mid-2021 and was planned to be completed within 120 days of the project plan, however, there were obstacles that resulted in the realization of the construction process requiring additional time to complete the construction. The method used in this study is the Fault Tree Analysis (FTA) method, the purpose of which is to find the fault tree of various errors that will result in the occurrence of unwanted events and the Event Tree Analysis (ETA) method is used to estimate and assess the probability of each consequence. can arise from an event in anticipation of its various consequences. This research methodology uses the concepts used in the survey using questionnaires and interviews with informants/respondents involved in the Catfish Market Revitalization project. There are two main intermediate events that cause delays in the development of the Revitalization of the Leles Garut People's Market, namely structural work / architectural work and work on the completion of side buildings. The result of identifying the total value of the minimum cut set combination probability for the Top Event of 0.9998 is the overall result of the total combination calculation of the minimum cut set. The results of the Initiating scenario impact analysis which has a "High" risk level caused by the Owner due to Rework work in the field, Changes to work plans, Delays in project work targets, There is some work that requires additional working hours.

References

Fadhol Yudhagama, “Analisis Keterlambatan Proyek Pada Pembangunan Gedung Perpustakaan UIN Sunan Ampel Surabaya,” UNIVERSITAS ISLAM INDONESIA, 2020, Accessed: Aug. 20, 2023. [Online]. Available: https://dspace.uii.ac.id/123456789/28251

W. S. Dicky Tri Sandyayuda, “Identifikasi Risiko Bahaya Pada Proses Produksi Batu Alam Di Stasiun Pemotongan Menggunakan Metode Hirarc Dan Five Why’s,” Jurnal Kendali Teknik dan Sains, vol. 1, pp. 01–14, 1013, doi: https://doi.org/10.59581/jkts-widyakarya.v1i4.1113.

D. Analysa, S. Suhudi, and P. D. Rahma, “Evaluasi Keterlambatan Proyek Pembangunan Graha Mojokerto Service City (GMSC) dengan Metode Fault Tree Analysis (FTA),” Reka Buana : Jurnal Ilmiah Teknik Sipil dan Teknik Kimia, vol. 4, no. 2, p. 36, Aug. 2019, doi: 10.33366/rekabuana.v4i2.1407.

H. Pandapotan Pasaribu, H. Setiawan, and W. I. Ervianto, “METODE FAILURE MODE AND EFFECT ANALYSIS (FMEA) DAN FAULT TREE ANALYSIS (FTA) UNTUK MENGIDENTIFIKASI POTENSI DAN PENYEBAB KECELAKAAN KERJA PADA PROYEK GEDUNG,” 2017. Accessed: Aug. 20, 2023. [Online]. Available: http://e-journal.uajy.ac.id/id/eprint/12057 Actions (login required)

D. M. Wirabakti, R. Abdullah, and A. Maddeppungeng, “STUDI FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PROYEK KONSTRUKSI BANGUNAN GEDUNG,” 2014. doi: https://doi.org/10.24853/jk.6.1.%25p.

Y. A. Messah et al., “KAJIAN PENYEBAB KETERLAMBATAN PELAKSANAAN PROYEK KONSTUKSI GEDUNG DI KOTA KUPANG,” 2013.

Baiq, “ANALISIS PENYEBAB KETERLAMBATAN PADA PEKERJAAN KONSTRUKSI JALAN KABUPATEN LOMBOK TENGAH DENGAN METODE ANALISA FAKTOR,” 2015. Accessed: Aug. 20, 2023. [Online]. Available: http://sipil.studentjournal.ub.ac.id/index.php/jmts/article/view/259

D. S. Nyata and I. P. A. Wiguna, “Analisis Keterlambatan pada Proyek PT Jatim Taman Steel di Gresik dengan Menggunakan Lean Six Sigma Framework,” Jurnal Aplikasi Teknik Sipil, vol. 16, no. 1, p. 15, Mar. 2018, doi: 10.12962/j2579-891x.v16i1.2866.

M. A. R. C. B. N. Ridhati Amalia, “Analisa Penyebab Keterlambatan Proyek Pembangunan Sidoarjo Town Square Menggunakan Metode Fault Tree Analysis (FTA),” JURNAL TEKNIK ITS, vol. 1, 2015, doi: DOI: 10.12962/j23373539.v1i1.2105.

D. Sasongko Nurhuda, W. Sutrisno, D. Langga, and C. Galuh, “ANALISIS RISIKO KETERLAMBATAN WAKTU PADA PELAKSANAAN PROYEK PEMBANGUNAN SPBU (STUDI KASUS DI KABUPATEN BANTUL, YOGYAKARTA).” Accessed: Aug. 20, 2023. [Online]. Available: https://jurnal.polines.ac.id/index.php/bangun_rekaprima/article/view/1571/106600

D. Eap, M. Arif Rohman, A. I. Risiko Keterlambatan Proyek Pembangunan Bendungan Temef Paket Di Provinsi NTT, and E. Anjang Pradana Dirgantara, “ANALISIS RISIKO KETERLAMBATAN PROYEK PEMBANGUNAN BENDUNGAN TEMEF PAKET I DI PROVINSI NTT,” vol. 6, no. 12, 2021, doi: 10.36418/Syntax-Literate.v6i12.5165.

A. Supriyono, “JURNAL KONSTRUKSI ANALISIS MANAJEMEN KONSTRUKSI PROYEK PEMBANGUNAN GRAGE MALL MAJALENGKA,” 2018.

Downloads

Published

2023-08-23

How to Cite

Indriani Isabela, & Ganjar J Johari. (2023). Analisis Risiko Keterlambatan Proyek Pada Pembangunan Revitalisasi Gedung Pasar Rakyat Leles Garut Tahap III. Jurnal Kendali Teknik Dan Sains, 1(4), 62–74. https://doi.org/10.59581/jkts-widyakarya.v1i4.1182

Similar Articles

<< < 1 2 3 4 5 6 > >> 

You may also start an advanced similarity search for this article.