Meningkatkan Efisiensi Penjadwalan Proyek Teknik Melalui Penerapan Microsoft Project

Authors

  • Revianty Nurmeyliandari Universitas Indo Global Mandiri
  • Febriyanti Panjaitan Universitas Bina Darma
  • Mukhlis Nahriri Bastam Universitas Indo Global Mandiri

DOI:

https://doi.org/10.59581/jphm-widyakarya.v2i2.3747

Keywords:

Microsoft Project, project scheduling, technical training, project management

Abstract

Improving the efficiency of engineering project scheduling through the implementation of Microsoft Project for CV Panca Bersaudara, a company specializing in construction projects, forms the background of this outreach activity. Conducted over three days from May 27-29, 2024, the program engaged four actively participating attendees in direct theoretical and practical training. Initial needs assessment, evaluation using pretests and posttests, and the use of educational licenses for Microsoft Project were integral to the structured approach aimed at measuring participant understanding and skills enhancement. Results demonstrated a significant increase from 68.29% in pretest scores to 88.96% in posttest scores, with positive feedback from CV Panca Bersaudara regarding the training's benefits in enhancing operational efficiency and project management.

References

Daulay, M. T., Zulfikar, Z., Siregar, S., Parinduri, L., Nasution, R. D., Maha, M. K., ... & Pane, M. M. (2022). Konsep Dasar Manajemen Proyek di Era 4.0. CV Rey Media Grafika.

Kartini, I., Saputra, K. A. K., Utami, N. W. A., Yasa, G. W., Kartika, I. N., Sujana, E., ... & Sukayana, G. A. (2022). Manajemen Proyek. Cendikia Mulia Mandiri.

Musa, S., Nurhayati, S., & Zubaedah, R. (2022). Peningkatan Kompetensi Pemasaran Produk Warga Belajar Pusat Kegiatan Belajar Masyarakat Melalui Pelatihan Marketplace Dan Canva. JMM (Jurnal Masyarakat Mandiri), 6(6), 4533-4542.

Nurmeyliandari, R., Panjaitan, F., Bastam, M. N., & Syaputra, H. (2023). Pelatihan Penggunaan AutoCAD untuk Kontruksi Bangunan Sipil. ABDIMASKU: Jurnal Pengabdian Masyarakat, 6(2), 525-529.

Stefany, O. (2015). Analisis Faktor Yang Mendukung Kesuksesan Proyek Gedung Bagi Kontraktor Di Kota Yogyakarta [Unpublished thesis]. Universitas Atma Jaya Yogyakarta.

Published

2024-06-30

How to Cite

Revianty Nurmeyliandari, Febriyanti Panjaitan, & Mukhlis Nahriri Bastam. (2024). Meningkatkan Efisiensi Penjadwalan Proyek Teknik Melalui Penerapan Microsoft Project. Jurnal Pelayanan Hubungan Masyarakat, 2(2), 91–97. https://doi.org/10.59581/jphm-widyakarya.v2i2.3747

Similar Articles

1 2 3 4 > >> 

You may also start an advanced similarity search for this article.