Optimalisasi Pelaksanaan Pergantian Crew Kapal dan Kontrak Perjanjian Kerja Laut (PKL) PT. Multi Jaya Samudra Belawan

Authors

  • Manjas Saprullah Politeknik Adiguna Maritim Indonesia Medan
  • Fadiyah Hani Sabila Politeknik Adiguna Maritim Indonesia Medan

DOI:

https://doi.org/10.59581/jmki-widyakarya.v1i3.4248

Keywords:

Optimization, Crew, Sea Work Agreement (PKL)

Abstract

The optimization of ship crew changes and Maritime Employment Agreement (MEA) contracts implementation is a crucial challenge in the shipping industry. This abstract details a holistic approach to understanding the constraints, optimization strategies, and impacts associated with crew changes and MEA implementation. The literature review highlights constraints such as uncertainty in policy changes, bureaucratic obstacles, and resistance to change. To address these constraints, optimization strategies involve technology integration, risk management, enhanced communication, transparency in MEA, and investment in training and development. The positive impacts of optimization include improved operational efficiency, crew welfare, company reputation, onboard safety, and harmonious relationships. These strategies are expected to provide guidance for shipping companies to overcome challenges and improve the implementation of crew changes and MEA, creating a more efficient, stable, and sustainable shipping industry.

References

Hasibuan, S. (2021). Pentingnya pelatihan dan pengembangan karyawan dalam industri perkapalan. Jurnal Sumber Daya Manusia Maritim, 12(1), 56-68.

Pakpahan, S. L., & Sabila, F. H. (2023). Implementation of the ISM code for MV ships. Eastern fair at PT Pelayaran Multi Jaya Samudera Belawan. Jurnal Rimba: Riset Ilmu Manajemen Bisnis dan Akuntansi, 1(3), 329-340.

Pasaribu, L. U. R. E., Dirhamsyah, D., & Sabila, F. H. (2023). Process clearance In & clearance out Millennium 806 use the application B-SIM by PT. Putra Samudera Inti in the area free trade zone Batam. Wawasan: Jurnal Ilmu Manajemen, Ekonomi dan Kewirausahaan, 1(4), 403-410.

Pratama, A. (2021). Strategi optimalisasi pelaksanaan pergantian crew kapal: Studi kasus di industri perkapalan Indonesia. Jurnal Manajemen Pelayaran, 10(2), 45-62.

Puzakesuma, D., & Sabila, F. H. (2024). Handling ship banking MT. Clarice loaded church liquid on PT. Tirtha Dasa Lintas Nusa Belawan. Globe: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan, 2(2), 154-169.

Sabila, F. H., & Cahyadi, W. D. Y. (2024). Analysis of existing constraints during loading and unloading of goods at Belawan Port by PT. Gelora Perkasa. Applied Business and Administration Journal, 3(03), 15-22.

Santoso, B. (2022). Penerapan teknologi dalam manajemen pergantian crew kapal: Suatu pendekatan untuk meningkatkan efisiensi operasional. Jurnal Inovasi Teknologi Maritim, 15(3), 112-130.

Saragih, R. R., Ridho, S., Danilwan, Y., & Sabila, F. H. (2024). Proses penanganan clearance out kapal ternak berbendera asing dengan inaportnet oleh PT. Pelayaran Semesta Sejahtera Lestari Belawan. Globe: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan, 2(1), 140-146.

Sianturi, P. S., & Sabila, F. H. (2024). The influence of manual system port services to Inaportnet on users of Belawan port services at PT. Adhigana Pratama Mulya Belawan. Jurnal Pajak dan Analisis Ekonomi Syariah, 1(1), 17-28.

Sinaga, I. D., Nst, M. M., & Sabila, F. H. (2024). Procedure for using the customs manifest application in the inward manifest issuance process at PT. Naval Global Trans Belawan. Kalao’s Maritime Journal, 5(1), 72-83.

Sitanggang, P. Y. B., Ridho, S., Dirhamsyah, D., & Sabila, F. H. (2023). Optimization of making dahsukim permits for foreign employees working on lay up ships at PT. Trans Shipping Agency Batam. Ocean Engineering: Jurnal Ilmu Teknik dan Teknologi Maritim, 2(2), 150-159.

Sitinjak, A., Ginting, S., & Sabila, F. H. (2023). Efficiency factors affecting metal box loading operations at PT. Gelora Perkasa Belawan. Jurnal Ilmu Sosial Mamangan, 12(03), 528-537.

Soeparno, C. (2018). Peran perjanjian kerja laut dalam mengatur hubungan antara perusahaan pelayaran dan awak kapal. Jurnal Hukum Kelautan, 8(1), 28-42.

Suryanto, M. R., Pratama, R. B., Panjaitan, P. S., & Sipahutar, Y. H. (2020). Pengaruh lama trip layar yang berbeda terhadap mutu ikan tuna (Thunnus sp) di Pelabuhan Perikanan Nusantara (PPN) Palabuhanratu Sukabumi-Jawa Barat. In Seminar Nasional Kelautan dan Perikanan ke VII (pp. 114-125). Nusa Tenggara Timur: Fakultas Kelautan dan Perikanan, Universitas Nusa Cendana.

Varezi, R., & Sabila, F. H. (2024). Process of receiving and disputing empty containers PT. Evergreen Shipping Agency Indonesia Medan. Jurnal Manuhara: Pusat Penelitian Ilmu Manajemen dan Bisnis, 2(2), 347-353.

Downloads

Published

2023-07-30

How to Cite

Manjas Saprullah, & Fadiyah Hani Sabila. (2023). Optimalisasi Pelaksanaan Pergantian Crew Kapal dan Kontrak Perjanjian Kerja Laut (PKL) PT. Multi Jaya Samudra Belawan. Jurnal Manajemen Kreatif Dan Inovasi, 1(3), 289–301. https://doi.org/10.59581/jmki-widyakarya.v1i3.4248

Similar Articles

1 2 3 4 5 > >> 

You may also start an advanced similarity search for this article.