Analisis Pemeliharaan Spring Load Cell Pada Mesin Roto Packer Di PT. Semen Indonesia (Persero) Tbk

Authors

  • Yvonne Christy Julyandini Universitas 17 Agustus 1945 Surabaya
  • I Nyoman Lokajaya Universitas 17 Agustus 1945 Surabaya

DOI:

https://doi.org/10.59581/jkts-widyakarya.v1i3.643

Keywords:

machine maintenance, maintenance scheduling, time between breakdowns, breakdown time

Abstract

PT. Semen Indonesia (Persero) Tbk is a company that produces cement and runs the production process 24 hours a day. The company uses Roto Packer in its packaging process. In carrying out machine maintenance efforts, the company has implemented a maintenance system, namely preventive maintenance. However, even though preventive maintenance has been carried out, the company still experiences downtime on the spring load cell components. Therefore, it is necessary to carry out an analysis in order to determine the time between breakdowns, breakdown times, and arrange optimal maintenance schedules for spring load cell components. This study uses the Reliability Centered Maintenance (RCM) method with the Kolmogorov-Smirnov test to develop preventive maintenance activities that have been scheduled by the company. The results obtained, for the spring load cell component, component replacement must be carried out every 4 days with a replacement time of 49 minutes and a reliability of 39.87%.

References

Afiva, W. H., Atmaji, F. T. D., & Alhilman, J. (2019). Usulan Interval Preventive Maintenance dan Estimasi Biaya Pemeliharaan Menggunakan Metode Reliability Centered Maintenance dan FMECA. Jurnal Ilmiah Teknik Industri, 18(2), 213–223. https://doi.org/10.23917/jiti.v18i2.8551

Akbar, M. R., & Widiasih, W. (2022). Analisis Perawatan Mesin Bubut dengan Metode Preventive Maintenance Guna Menghindari Kerusakan Secara Mendadak dan Untuk Menghitung Biaya Perawatan. Jurnal SENOPATI : Sustainability, Ergonomics, Optimization, and Application of Industrial Engineering, 4(1), 32–45. https://doi.org/10.31284/j.senopati.2022.v4i1.3086

Aziza, N., Prastiyo, W. A., & Widiasih, W. (2019). Penjadwalan Penggantian Komponen Mesin Press Selang Hidrolik di CV Rhoda Jaya. Seminar Nasional Teknik Industri Universitas Gadjah Mada, 54–59.

Farisi, M. N. Al. (2021). Analisis Perawatan Mesin Batching Plant Menggunakan Metode Reliability Centered Maintenance (RCM). Universitas Jember.

Gunawan, A. S., Setiawan, A., & Legirian, F. (2017). Perancangan Maintenance Management Informastion System untuk Unit Pemadam Kebakaran (Studi Kasus : Perusahaan X). Jurnal Nasional Teknologi Dan Sistem Informasi, 3(2), 219–224. https://doi.org/10.25077/teknosi.v3i2.2017.219-224

Jardine, A. K. S., & Tsang, A. H. c. (2013). Maintenance, Replacement, and Reliability Theory and Applications (2nd ed.). CRC Press.

Kumala, A. C. (2022). Perancangan Penjadwalan Pemeliharaan Mesin Produksi untuk Meningkatkan Kehandalan menggunakan Metode RCM (Studi Kasus : PT. Intimas Surya, Pelabuhan Benoa, Bali).

Kurniawan, A. D. (2016). Penerapan Metode RCM pada Perawatan Hard Capsule Machine A di PT. Kapsulindo Nusantara. Institut Teknologi Sepuluh Nopember Surabaya.

Lokajaya, I. N. (2009). Penentuan Waktu Penggantian Komponen Dan Biaya Penggantian Yang Optimal Pada Mesin Crawler Rock Drill. Jurnal Teknik Industri HEURISTIC, 6(1), 32–40.

Lubis, M. F. I. (2021). Implementasi Perawatan Preventive Pada Mesin Produksi Untuk Meningkatkan Kehandalan Mesin Menggunakan Metode Reliability Centered Maintenance (RCM) (Studi Kasus : PT. XYZ). In Https://Dspace.Uii.Ac.Id/Handle/123456789/35818. https://dspace.uii.ac.id/handle/123456789/35818

Nursanti, E., Avief, R. M. S., Sibut, & Kertaningtyas, M. (2019). Maintenance Capacity Planning Efisiensi & produktivitas. Dream Litera Buana.

Pranowo, I. D. (2019). Sistem dan Manajemen Pemeliharaan (Maintenance: System and Management) (1st ed.). DEEPUBLISH.

Raharja, I. P., Suardika, I. B., & Galuh W, H. (2021). Analisis Sistem Perawatan Mesin Bubut menggunakan Metode RCM (Reliability Centered Maintenance) di CV. Jaya Perkasa Teknik. Industri Inovatif : Jurnal Teknik Industri, 11(1), 39–48. https://doi.org/10.36040/industri.v11i1.3414

Setyawan, B., & Widiasih, W. (2022). Penentuan Penjadwalan Perawatan dan Penggantian Komponen Mesin Belt Conveyor Coal Ash Handling PT ABC. 1–15.

Shinta, H. D. W., Yanti, R., & Qurtubi. (2021). Analisis Perawatan Mesin Conveyor dengan Metode Reliability Centered Maintenance (RCM) terhadap Mesin Air Jet Loom (AJL). Seminar Dan Konferensi Nasional IDEC 2021. https://doi.org/10.30587/justicb.v3i1.4761

Sulayah, D. A. (2019). Analisis Jarak Tempuh Penggantian Magnetic Clutch AC Mobil Toyota Avanza dan Daihatsu Xenia di PT. Adi Sarana Armada Tbk. Surabaya. Universitas 17 Agustus 1945 Surabaya.

Suryana, W. (2021). Analisis pemeliharaan mesin produksi dengan metode RCM (Reliability Centered Maintenace) Pada PT. Eluan Mahkota Kabupaten Rokan Hulu. Universitas Islam Riau.

Tantri, D., Widiasih, W., & Khoiroh, S. M. (2018). Perancangan Sistem Perawatan Mesin Corrugated Carton Box dengan Metode Rcm pada PT. Intan Ustrix Gresik. Industri.Untag-Sby.Ac.Id. http://industri.untagsby.ac.id/backend/uploads/pdf/Jurnal_TA5.pdf

Wibowo, H., Sidiq, A., & Ariyanto. (2018). Penjadwalan Perawatan Komponen Kritis Dengan Pendekatan Reliability Centered Maintenance (Rcm) Pada Perusahaan Karet. Jurnal Ilmiah Teknik Industri, 6(2), 79–87. https://doi.org/10.24912/jitiuntar.v6i2.4106

Widiasih, W., & Aziza, N. (2019). Perhitungan Biaya Penggantian Komponen dengan Mempertimbangkan Penjadwalan Perawatan pada Mesin Bucket Raw Material. Journal of Industrial Engineering and Management, 14(02), 68–76.

Downloads

Published

2023-06-20

How to Cite

Yvonne Christy Julyandini, & I Nyoman Lokajaya. (2023). Analisis Pemeliharaan Spring Load Cell Pada Mesin Roto Packer Di PT. Semen Indonesia (Persero) Tbk. Jurnal Kendali Teknik Dan Sains, 1(3), 137–150. https://doi.org/10.59581/jkts-widyakarya.v1i3.643

Similar Articles

<< < 1 2 3 4 

You may also start an advanced similarity search for this article.