Abstract

PT. Z is one of the companies that produces steel plates located in Surabaya, East Java. Production process at PT. The Z fully uses machines that operate 24 hours a day. The bottleneck in the steel plate production process is that there are often breakdowns caused by people, machines, and materials. In the engine factor, there is often a machine breakdown that makes production stop. The smooth running of the production process is disrupted due to damage to the production machine. High downtime often occurs due to repairs and replacement of components in certain machine parts. Therefore the machine needs maintenance / maintenance (maintenance). Among all production machines, rolling mill machines are the machines with the highest downtime rates. The components in the rolling mill machine that cause the highest downtime of 12,851 minutes are roll components. This study intends to make a scheduling plan for roll replacement on rolling mill machines. The methodology used in this study is Preventive Maintenance by calculating its reliability and making a schedule for replacing and maintaining the machine. The results showed that the average roll replacement every 6 days with 63.21% reliability, and the average roll replacement process time was 131 minutes.

References

Akbar, M. R., & Widiasih, W. (2022). Analisis Perawatan Mesin Bubut dengan Metode Preventive Maintenance Guna Menghindari Kerusakan Secara Mendadak dan Untuk Menghitung Biaya Perawatan. Jurnal SENOPATI: Sustainability, Ergonomics, Optimization, and Application of Industrial Engineering, 4(1), 32-45. https://doi.org/10.31284/j.senopati.2022.v4i1.3086

Arsyad, M., & Sultan, A.Z. 2018. Manajemen Perawatan.Yogyakarta: Deepublish.

Asih, E. W., Sodikin, I., & Triski, D. S. (2021). PENJADWALAN PERAWATAN PREVENTIF DAN WAKTU PENGGANTIAN MESIN HULLER DENGAN METODE AGE REPLACEMENT DAN THERBOGH’S MODEL. PROSIDING SNAST, 22-31. PENJADWALAN PERAWATAN PREVENTIF DAN WAKTU PENGGANTIAN MESIN HULLER DENGAN METODE AGE REPLACEMENT DAN THERBOGH’S MODEL | PROSIDING SNAST (akprind.ac.id)

Asprilla, G., & Agustiar, P. (2020). Meningkatkan Kinerja Mesin Extrude Hydron Menggunakan Metode Preventive Maintenance. JTTM: Jurnal Terapan Teknik Mesin, 1(1), 18-24. Meningkatkan Kinerja Mesin Extrude Hydron Menggunakan Metode Preventive Maintenance | JTTM : Jurnal Terapan Teknik Mesin (sttmcileungsi.ac.id)

Haq, M. I., & Riandadari, D. (2019). Penentuan Penjadwalan Preventive Maintenance Pada Komponen Mesin Callender Di Pt. Karet Ngagel Surabaya Wira Jatim. Jurnal Pendidikan Teknik Mesin, 9(1). PENENTUAN PENJADWALAN PREVENTIVE MAINTENANCE PADA KOMPONEN MESIN CALLENDER DI PT. KARET NGAGEL SURABAYA WIRA JATIM | Jurnal Pendidikan Teknik Mesin (unesa.ac.id)

Hidayah, S. N., & Widjajati, E. P. (2023). Penentuan Interval Perawatan Mesin Wood Pallet Secara Preventif Dengan Metode Modularity Design Dan Age Repalcement Pada PT Yale Woodpallet Indonesia. Jurnal Teknik Mesin, Industri, Elektro dan Informatika, 2(2), 93-107. Penentuan Interval Perawatan Mesin Wood Pallet Secara Preventif Dengan Metode Modularity Design Dan Age Repalcement Pada PT Yale Woodpallet Indonesia | Jurnal Teknik Mesin, Industri, Elektro dan Informatika (politeknikpratama.ac.id)

Hidayat, T., Abizar, H., & Rokhadhitomo, O. (2023). Analisis Perawatan preventif Pada Mesin Horizontal Sand Mill Tipe ROOT RTSM–50ADL E. Jurnal Pendidikan Teknik Mesin Undiksha, 11(1), 131-140. Analisis Perawatan preventif Pada Mesin Horizontal Sand Mill Tipe ROOT RTSM – 50ADL E | Jurnal Pendidikan Teknik Mesin Undiksha

Imtihan, M., & Somantri, Y. (2022). Perawatan Komponen Mesin Forming Untuk Meningkatkan Produksi Cup Minuman. JENIUS: Jurnal Terapan Teknik Industri, 3(1), 12-21. Perawatan Komponen Mesin Forming Untuk Meningkatkan Produksi Cup Minuman | JENIUS : Jurnal Terapan Teknik Industri (sttmcileungsi.ac.id)

Khaurullah, F., & HR, D. A. (2022). Analisis Penentuan Waktu Kegiatan Perawatan Preventif Yang Tepat Bagi Mesin Produksi Glasstube Lampu 2U Sesuai Keandalannya (Studi Kasus: PT. Panca Aditya Sejahtera). Jurnal Teknik Industri, 25(01), 52-75. Analisis Penentuan Waktu Kegiatan Perawatan Preventif Yang Tepat Bagi Mesin Produksi Glasstube Lampu 2U Sesuai Keandalannya (Studi Kasus: PT.Panca Aditya Sejahtera) | Jurnal Teknik Industri (univ45sby.ac.id)

Kurniawan, Fajar. 2013. Teknik dan Aplikasi Manajemen Perawatan Industri. Yogyakarta: Graha Ilmu.

Law, Averill M. & W. David Kelton. (1991). Simulation Modeling & Analysis, Fifth Edition. McGraw-Hill, International.

Kusuma, A. (2019). Analisa Kinerja Mesin Wtp Menggunakan Metode Fmea Dan Penjadwalan Preventif Maintenance. Waktu: Jurnal Teknik UNIPA, 17(1), 15-25. ANALISA KINERJA MESIN WTP MENGGUNAKAN METODE FMEA DAN PENJADWALAN PREVENTIF MAINTENANCE | WAKTU: Jurnal Teknik UNIPA (unipasby.ac.id)

Lokajaya, I. Nyoman. (2009). Penentuan Waktu Penggantian Komponen dan Biaya Penggantian yang Optimal pada Mesin Crawler Rock Drill. 6(1), 32–40.

Marasabessy, S. A., Henaulu, A. K., & Rumbouw, J. (2020). Analisis Sistem Perawatan Mesin Produksi pada CV Abadi Tiga Mandiri (Studi Kasus Mesin Cup Sealer). KAIZEN: Management Systems & Industrial Engineering Journal, 3(2), 80. https://d1wqtxts1xzle7.cloudfront.net/70925715/pdflibre.pdf?1633114526=&response-contentdisposition=inline%3B+filename%3DAnalisis_Sistem_Perawatan_Mesin_Produksi.pdf&Expires=1686816839&Signature=H58MSIczze2T9FS8WMSy9SMMSjO7PsOGUASZOkgddHJEpMRGp0XsVbXKe-jmk6 Zbg~hed15x29pHhU7A1s1KqMwfcq2B~KS62r~xIc8mrNDf2THh2~8O4eLdqTX5Qc0UW7rUZ5G-HO~yK5PtR7l9~oczUz40iq-d~ezfrgSGXX GPst1enbbFNrWUXEF5yWeBJx5PxOdZJn5XiQnYjBP67OVLH5u7C4kx6KVRwLJFyGosw2b~-EjBBk6y7-26v0r29gg6~eZansLFFtOImwqN6VTqG0nVOH7GWaiU-lCsxGGXGJIDNPSDeP0vqBcdlxwl1Jv3zd5-wGjohd9WCb-w__&Key-Pair-Id=APKAJLOHF5GGSLRBV4ZA

Mesra, T. (2020). Analisis Perawatan Mesin Pompa Sentrifugal dengan Metoda Failure Mode and Effect Analysis (FMEA). JURNAL UNITEK, 13(2), 39-46. Analisis Perawatan Mesin Pompa Sentrifugal dengan Metoda Failure Mode and Effect Analysis (FMEA) | JURNAL UNITEK (sttdumai.ac.id)

Mulyaningsih, S., & Mindayani, I. (2022). Perencanaan Perawatan Mesin Bubut di Lingkungan Laboratorium Geologi Teknik Institut Sains & Teknologi AKPRIND Yogyakarta. Jurnal Rekayasa Industri (JRI), 4(1), 29-36. Perencanaan Perawatan Mesin Bubut di Lingkungan Laboratorium Geologi Teknik Institut Sains & Teknologi AKPRIND Yogyakarta | Jurnal Rekayasa Industri (JRI) (widyamataram.ac.id)

Ngadiyono, Yatin. 2010. Pemeliharaan Mekanik Industri. Yogyakarta

Rijal, M. I., Putra, A. Y. W., & Raihan, R. A. (2022). ANALISIS PERAWATAN MESIN CHAIN SCRAPER CONVEYOR DI PT. CEMINDO GEMILANG BAYAH. Teknika, 7(4), 191-199. ANALISIS PERAWATAN MESIN CHAIN SCRAPER CONVEYOR DI PT. CEMINDO GEMILANG BAYAH | Teknika (sttw.ac.id)

Setiawannie, Y., & Marikena, N. (2022). Perencanaan Penjadwalan Preventive Maintenance Mesin Pounch dengan Critical Path Method di PT. Grafika Nusantara. INSOLOGI: Jurnal Sains dan Teknologi, 1(1), 01-10. Perencanaan Penjadwalan Preventive Maintenance Mesin Pounch dengan Critical Path Method di PT. Grafika Nusantara | INSOLOGI: Jurnal Sains dan Teknologi (literasisains.id)

Siregar, N., & Munthe, S. (2019). Analisa Perawatan Mesin Digester dengan Metode Reliabity Centered Maintenance pada PTPN II Pagar Merbau. JIME (Journal of Industrial and ManufactureEngineering), 3(2).http://download.garuda.kemdikbud.go.id/article.php?article=1215581&val=10515&title=Analisa%20Perawatan%20Mesin%20Digester%20dengan%20Metode%20Reliabity%20Centered%20Maintenance%20pada%20PTPN%20II%20Pagar%20Merbau

Susetyo, A. E., & Nurhardianto, E. (2019). Penentuan komponen kritis untuk mengoptimalkan keandalan mesin cetak. Science Tech: Jurnal Ilmu Pengetahuan Dan Teknologi, 5(2), 13-22. PENENTUAN KOMPONEN KRITIS UNTUK MENGOPTIMALKAN KEANDALAN MESIN CETAK | Science Tech: Jurnal Ilmu Pengetahuan dan Teknologi (ustjogja.ac.id)

Widiasanti, Irika., & Lenggogeni. (2013). Manajemen Konstruksi. Bandung: PT Remaja Rosdakarya.

Widiasih, W. (2019). Perhitungan Biaya Penggantian Komponen dengan Mempertimbangkan Penjadwalan Perawatan pada Mesin Bucket Raw Material. Tekmapro: Journal of Industrial Engineering and Management, 14(2), 68-76. http://download.garuda.kemdikbud.go.id/article.php?article=1411773&val=6224&title=PERHITUNGAN%20BIAYA%20PENGGANTIAN%20KOMPONEN%20DENGAN%20MEMPERTIMBANGKAN%20PENJADWALAN%20PERAWATAN%20PADA%20MESIN%20BUCKET%20RAW%20MATERIAL

Downloads

Published

2023-06-16

How to Cite

Martina De Pores Rio Gani, & I Nyoman Lokajaya. (2023). Strategi Penjadwalan Penggantian Roll Pada Mesin Rolling Mill Di PT. Z. Jurnal Kendali Teknik Dan Sains, 1(3), 54–65. https://doi.org/10.59581/jkts-widyakarya.v1i3.582

Similar Articles

1 2 > >> 

You may also start an advanced similarity search for this article.