Implementasi Metode Material Requirment Planning (MRP) Dalam Melakukan Perencanaan Persediaan Bahan Baku Kursi Susun Pada CV XYZ
DOI:
https://doi.org/10.59581/jkts-widyakarya.v1i3.656Keywords:
Stacking Chairs, Demand, Raw Materials, JIP, MRP, Lot Sizing.Abstract
CV XYZ is a company engaged in manufacturing with production in the form of stacking chairs. This company has a production capacity of 200 units of stacking chairs every day. The company has 3 types of bunk chairs, namely CH-100 KR, CH-200 KR, and CH-200 PC. Customer demand at this company tends to be fluctuating (up and down) which results in the company experiencing difficulties in determining the optimal raw material inventory to meet customer needs. The Material Requirement Planning (MRP) method is an appropriate method for scheduling inventory. The result of this scheduling model is in the form of a master production schedule (JIP) which is used to determine the demand for chair products for the next 6 months. The results of data processing obtained requests for stacking chairs in the next 6 months for the type CH-100 KR 10.724 unit, CH-200 KR of 10.998 unit, and CH-200 PC of 9.687 unit. The demand is then calculated using the MRP approach with LFL and EOQ. An effective material requirements planning method with the lowest cost is to use the Lot For Lot (LFL) method which gives the lowest cost results IDR 7,475,617,611.
References
dengan Metode Material Requirement Planning (MRP) pada PT. Merak Jaya Beton Plant Kedung Cowek Surabaya. INOBIS: Jurnal Inovasi Bisnis Dan Manajemen Indonesia, 2(4), 505–512. https://doi.org/10.31842/jurnal-inobis.v2i4.108
Ernita, T., Ervil, R., & Meidy, R. (2021). Perencanaan Persediaan Bahan Baku Dengan Metode Material Requirement Planning (Mrp) Pada Proses Produksi Bak Mobil Truk Di Cv. Lursa Abadi Kota Padang. Jurnal Sains Dan Teknologi: Jurnal Keilmuan Dan Aplikasi Teknologi Industri, 21(1), 40. https://doi.org/10.36275/stsp.v21i1.357
Nugraha, E. Y., & Suletra, I. W. (2017). Analisis Metode Peramalan Permintaan Terbaik Produk Oxycan pada PT. Samator Gresik. Seminar Dan Konferensi Nasional IDEC, 414–422.
Surianto, A. (2013). Penerapan Metode Material Requirement Planning ( MRP ) Di PT. Bokormas Mojokerto. Jurnal Ilmiah Mahasiswa, FEB UB, 1(2), 1–61.
Tis, P. T. (n.d.). 182837-ID-analisis-perencanaan-dan-pengendalian-pe. IX(3), 320–337.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2023 Arifa Yuriyadi, Siti Muhimatul Khoiroh
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.