Analisis Preventive Mantenance Pada Komponen Mesin Finger Joint Untuk Mengurangi Downtime Pada PT. Romi Violeta Sidoarjo

Authors

  • Nur Moh. Danang Andrian Universitas 17 Agustus 1945 Surabaya
  • I Nyoman Lokajaya Universitas 17 Agustus 1945 Surabaya

DOI:

https://doi.org/10.59581/jkts-widyakarya.v1i3.592

Keywords:

Downtime, Scheduling, Finger Joint, Maintenance

Abstract

PT. Romi Violeta is a furniture company engaged in the production of rattan and wood products for the global market. The problem that often occurs is that the Finger Joint machine often experiences damage to the engine components. Therefore, the objectives of this research are to identify critical components in the Finger Joint machine, develop a maintenance scheduling for the machine's components, and compare the maintenance costs before and after implementing the scheduling. The analysis revealed that the Hydraulic component has a cumulative value of 40%, followed by the Cutter component with a cumulative value of 34.4%, and the Air Hose component with a cumulative value of 5.6%. Consequently, a preventive maintenance schedule was determined, with the Hydraulic component requiring maintenance every 31 days, the Cutter component every 36 days, and the Air Hose component every 207 days. This resulted in a reduction in maintenance costs from the previous amount of Rp.5,200,000 to Rp.1,210,847.

References

Afiva, W. H., Atmaji, F. T. D., & Alhilman, J. (2019). Usulan Interval Preventive Maintenance dan Estimasi Biaya Pemeliharaan Menggunakan Metode Reliability Centered Maintenance dan FMECA. Jurnal Ilmiah Teknik Industri, 18(2), 213–223. https://doi.org/10.23917/jiti.v18i2.8551

Akbar, M. R., & Widiasih, W. (2022). Analisis Perawatan Mesin Bubut dengan Metode Preventive Maintenance Guna Menghindari Kerusakan Secara Mendadak dan Untuk Menghitung Biaya Perawatan. Jurnal SENOPATI : Sustainability, Ergonomics, Optimization, and Application of Industrial Engineering, 4(1), 32–45. https://doi.org/10.31284/j.senopati.2022.v4i1.3086

Asprilla, G. (2020). Meningkatkan Kinerja Mesin Extrude Hydron Menggunakan Metode Preventive Maintenance. JTTM : Jurnal Terapan Teknik Mesin, 1(1), 18–24. https://doi.org/10.37373/msn.v1i1.15

Dio, A. D., Mz, H., Tamalika, T., Tridinanti, U., Pendahuluan, A., & Teori, B. L. (2023). PENERAPAN METODE AGE REPLACEMENT PADA USULAN JADWAL PREVENTIVE MAINTENANCE MESIN DUMP TRUCK DI PT . BSE BAYUNG. 06(01), 57–65.

Hanafi, I., & Nurrohkayati, A. S. (2022). Preventive Maintenance Planning 500 Hm on Dump Truck Mercedes Benz Axor 4843k at PT. Mega Jasa Karya Bersama Site PT. Baramulti Sukses Sarana. Procedia of Engineering and Life Science, 2(2), 2–7. https://doi.org/10.21070/pels.v2i2.1275

Haq, M. I. (2019). Penentuan Penjadwalan Preventive Maintenance Pada Komponen Mesin Callender Di Pt. Karet Ngagel Surabaya Wira Jatim. Jurnal Pendidikan …, 09, 8–16. https://jurnalmahasiswa.unesa.ac.id/index.php/jurnal-pendidikan-teknik-mesin/article/view/29914

Hidayat, T., Sudiro, S., Studi, P., Teknik, M., & Pancasila, U. (2019). Optimasi Kapasitas Lantai Produksi Melalui Peningkatan Penerapan Preventive Maintenance Kasus Produksi Line Tile Keramik. 13(1), 1–10.

I Nyoman, L. (2009). Penentuan waktu penggantian komponen dan biaya penggantian yang optimal pada mesin crawler rock drill. 6(1), 32–40.

Jenita Marbun, N., & Tahir, T. (2022). Preventive Maintenance Mesin Press Hydraulic Limbah Spent Bleaching Earth Menggunakan Metode Reliability Centered Maintenance di PT Mega Green Technology Dumai. 17(November), 145–155.

Mobley, R. K., & Wikoff, D. J. (2008). Maintenance Engineering Handbook (R. K. Mobley (ed.); Seventh). McGraw-Hill.

Mohammad, S., Budiharjo, & Diana Ayu, R. (2022). USULAN PERAWATAN MESIN BENDING 90? DENGAN PENDEKATAN PREVENTIVE MAINTENANCE BERDASAR METODE KEANDALAN DAN FMEA DI PT. RINNAI INDONESIA- CIKUPA. 175–184.

Nurbani, S. N., & P, J. S. Y. (2019). Analisis Perbandingan Metode Preventive Maintenance Dan Corrective Maintenance Mesin Tenun Pada Departemen Weaving Di PT. Bandung Sakura Textile Mills. ReTIMS, 1(1), 22–28.

Pranowo, I. D. (2019). Sistem dan Manajemen Pemeliharaan (Mantenance System and Management) (D. Novidiantoko (ed.); Pertama). DEEPUBLISH.

Putra F, Maniyani A, & Iklimaturriza M. (2021). Perawatan Carryroller Belt Conveyor C101 pada mesin Incinerator dengan Metode Fishbone Diagram di PT Fajar Surya Wisesa,Tbk. Jurnal Teknik Industri, 2(1), 51–57.

Ramadhani, A. G., Zahra Azizah, D., Nugraha, F., & Fauzi, M. (2022). Analisa Penerapan Tpm (Total Productive Maintenance) Dan Oee (Overall Equipment Effectiveness) Pada Mesin Auto Cutting Di Pt Xyz. Jurnal Ilmiah Teknik Dan Manajemen Industri, 2(1), 2022–2059.

Sanam, Hamid Abdillah, O. R. (2022). Studi Kasus Kebocoran Horizontal Sand Mill Machine KWS-30L dengan Menerapkan Preventive Maintenance di PT. ACI. Jurnal Pendidikan Teknik Mesin Undiksha, 10(2), 94–106. http://10.0.93.79/jptm.v10i2.51606

Shodiqin, H. (2022). Sustainable Maintenance Melalui Prediksi Preventive Maintenance di Plant Cold Roll Mills (CRM) PT Krakatau Steel (Persero) Tbk dengan Algoritma Naïve Bayes Classifier dan Decision Tree. JATISI (Jurnal Teknik Informatika Dan Sistem Informasi), 9(2), 876–890. https://doi.org/10.35957/jatisi.v9i2.1818

Teknik, J. I. I., Departement, S., Pt, L., & Djaja, E. (2022). Jurnal Energy Analisis Perawatan Mesin Yilmak Laundry dengan Metode Reliability. 12(1), 14–17.

Wignjosoebroto, S. (2003). Pengantar Teknik & Manajemen Industri (I. K. Gunarta (ed.); Pertama). Guna Widya.

Wiyono, N., RIYANTO, ., & REJEKI, A. S. (2022). Perancangan Sistem Informasi Preventive Maintenance Berbasis Web Pada Pt Macroprima Panganutama. Insan Pembangunan Sistem Informasi Dan Komputer (IPSIKOM), 9(2), 93–101. https://doi.org/10.58217/ipsikom.v9i2.206

Downloads

Published

2023-06-16

How to Cite

Nur Moh. Danang Andrian, & I Nyoman Lokajaya. (2023). Analisis Preventive Mantenance Pada Komponen Mesin Finger Joint Untuk Mengurangi Downtime Pada PT. Romi Violeta Sidoarjo. Jurnal Kendali Teknik Dan Sains, 1(3), 66–79. https://doi.org/10.59581/jkts-widyakarya.v1i3.592