Perancangan Ulang Tata Letak Fasilitas Workshop Fabrikasi Dengan Metode Systematic Layout Planning Di PT ABC
DOI:
https://doi.org/10.59581/jkts-widyakarya.v1i3.551Keywords:
ARC, ARD, Rectilinear, Systematic Layout PlanningAbstract
PT. ABC is a manufacturing company whose production line is railroad components. In the production process, there is backtracking in the production process so that the production process is less efficient. The purpose of this research is to compare the initial material handling layout mileage with the proposed layout. This study uses the Systematic Layout Planning (SLP) method to determine the layout proposals that will be provided with the help of Blocplan software. From the proposed layout, the total distance traveled for the passenger seat production process is 402.8 meters and at 277.8 meters the difference is 125 meters.
References
Arif, M. (2017). “Perancangan Tata Letak Fasilitas”. Sleman: Cv Budi Utama
Adiasa, I., Suarantalla. R., Rafi M. S., & Hermanto K. (2020). Perancangan Ulang Tata Letak Fasilitas Pabrik Di CV. Apindo Brother Sukses Menggunakan Metode Systematic Layout Planning (SLP). 19(2), 151 - 158.
Adiyanto, O., & Clistia, A. F. (2020). Perancangan Ulang Tata Letak Fasilitas Ukm Eko Bubut Dengan Metode Computerized Relationship Layout Planning (Corelap). Jurnal Integrasi Sistem Industri, 7(1), 49–56.
Afifah, N., & Ngatilah, Y. (2020). Analisis Perancangan Ulang Tata Letak Fasilitas Produksi Dengan Metode Systematic Layout Planning (Slp) Di Pt. Ej. Juminten, 1(4), 104–116.
Alamsyah, A. Dwiky, & Suhartini. (2021). Usulan Rancangan Tata Letak Fasilitas Proses Replating Kapal Dengan Menggunakan Metode Arc Dan Ard ( Studi Kasus Di Sbu Galangan Pelni Surya ). Seminar Nasional Teknologi Industri Berkelanjutan I (Senastitan I), 65–71.
Amelia, A. A., Dkk. (2022). “Impelementasi Manajemen Keuangan, Sumber Daya Manusia, Pendidikan Dan Rumah Sakit”. Pekalongan: Pt. Nasya Expanding Management.
Barbara, A., & Cahyana, A. S. (2021). Perancangan Tata Letak Fasilitas Produksi Dengan Menggunakan Metode Activity Relationship Chart (ARC) dan From to Chart (FTC). Procedia Of Engineering and Life Science. 1(2)
Camerawati, F. L., & Handoyo, H. (2021). Perancangan Ulang Tata Letak Fasilitas Gudang Bahan Baku Dengan Metode Systematic Layout Planning (Slp) Di Pt. Inka Multi Solusi. Juminten, Vol.2, No 3, P.59-70,
Findiastuti, W. (2021). “Perancangan Tata Letak Fasilitas Mini Plant Garam Ii”. Malang: Mnc Publishing
Haekal, J., Eko, D., & Prasetio, A. (2020). Planning Of Production Facilities Layouts In Home Industry With The Systematic Layout Planning Method. Ijiset-International Journal Of Innovative Science, Engineering & Technology, 7(10), 143–153. Www.Ijiset.Com
Jumaidi, (2021). “Manajemen Operasi”. Purwodadi: Cv Sarnu Untung
Nugeroho, A. A. U. (2021). Usulan Perbaikan Tata Letak Fasilitas Pabrik Tahu Dengan Metode Systematic Layout Planning. Jurnal Optimasi Teknik Industri (Joti), 3(2), 65. Https://Doi.Org/10.30998/Joti.V3i2.1045
Nurhidayat, F. (2021). Usulan Perbaikan Tata Letak Fasilitas Lantai Produksi Dengan Metode Systematic Layout Planning (Slp) Di Pt Dss. Ikra-Ith Teknol., 5(80)
Polewangi, Y. D., Sutrisno, & Angkasa, S. (2021). Analisis Kelayakan Perancangan Ulang Tata Letak Pabrik Pengolah Biji Kopi Dengan Metode Activity Relationship Chart (Arc) Di Cv Yudi Putra Medan. Juriti Prima (Junal Ilmiah Teknik Industri Prima), 5(1), 9–16.
Purnomo, A. (2022). Abstrak Relayout Gudang Untuk Menata Dangerous Goods Yang Sesuai Dengan Standarisasi Asosiasi Internasional Imo Dan Imdg Merupakan Hal Yang Esensi Dilakukan Untuk Menjamin Keamanan Dan Keselamatan Baik Penataan Dangerous Goods Dan Relayout Gudang PT Linfo. Jurnal Logistik Bisnis, 12(02), 42–52.
Putri, R. E., & Ismanto, W. (2019). Pengaruh Perancangan Ulang Tata Letak Fasilitas Di Area Operasional Kerja Berbasis 5s Untuk Pengajuan Modal Usaha. Jurnal Dimensi, 8(1), 71–89. Https://Doi.Org/10.33373/Dms.V8i1.1824
Rozak, A., Kristianto, A. D., Raharjo, G. S., & Saleh, N. A. (2021). Penerapan ARC dan ARD Untuk Membuat Rancangan Layout Fasilitas pada Pabrik Krupuk Menggunakan BLOCPLAN di CV Arto Moro. Bulletin of Applied Industrial Engineering Theory, 2(2), 145 – 149
Septyawan, R. D., Prastiyo, D. A., & Putra, A. C. (2019). Perancangan Tata Letak Fasilitas Ulang (Relayout) Untuk Meminimalisasi Material handling Pada Pabrik Pembuatan Tahu Pt Xyz Menggunakan Metode Activity Relationship Chart. Seminar Nasional Penelitian Dan Pengabdian Masyarakat, 1–6.
Winarso, K. (2020). “Perancangan Dan Desain Layout Pabrik Jilid 1”. Malang: Mnc Publishing
Yulistio, A., Basuki, M., & Azhari, A. (2022). Perancangan Ulang Tata Letak Display Retail Fashion Menggunakan Activity Relationship Chart (Arc). Jurnal Ilmiah Teknik Industri, 10(1), 21–30. Https://Doi.Org/10.24912/Jitiuntar.V10i1.9388
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2023 Ahmad Bayu Laksono, Joumil Aidil Saifuddin
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.