Analisis Perawatan Komponen Chamber Box Pada Mesin Laminating Departemen Printing Produksi Kemasan Plastik (Studi Kasus:Pt.Daesang Ingredients Indonesia)

Authors

  • Ridhwan Dwi W Universitas 17 Agustus 1945 Surabaya
  • I Nyoman Lokajaya Universitas 17 Agustus 1945 Surabaya

DOI:

https://doi.org/10.59581/jkts-widyakarya.v1i3.606

Keywords:

Preventive Maintenance, ,Realibility, Down Time.

Abstract

  1. Miwon Indonesia is one of the companies that started as a company in 1973, the company finally changed the company's name with PT. Daesang Ingredients Indonesia The research method used is Preventive Maintenance, in this study researchers analyzed the time between laminating machine damage to the Chamber Box Heater component, the data taken was the Laminating machine down time data in July – December 2022 The results of analysis and data processing showed that the level of component reliability, namely for the chamber box heater component of 0.5892 occurred on day 5. And while the press roll rewinder component obtained a reliability level of 0.5925 on day 7. And the results of the calculation of costs before preventive maintenance are obtained at a cost of Rp. 47,953,572 per 6 months and costs after preventive maintenance are obtained at Rp. 29,677,876 per 6 months. With a difference of Rp.18,285,696. From the results of preventive maintenance costs, it can reduce maintenance costs at PT. Daesang Ingredients Indonesia than before preventive maintenance calculations are carried out.

References

Afiva, W. H., Atmaji, F. T. D., & Alhilman, J. (2019). Usulan Interval Preventive Maintenance dan Estimasi Biaya Pemeliharaan Menggunakan Metode Reliability Centered Maintenance dan FMECA. Jurnal Ilmiah Teknik Industri, 18(2), 213–223. https://doi.org/10.23917/jiti.v18i2.8551

Akbar, M. R., & Widiasih, W. (2022). ANALISIS PERAWATAN MESIN BUBUT DENGAN METODE PREVENTIVE MAINTENANCE GUNA MENGHINDARI KERUSAKAN SECARA MENDADAK DAN UNTUK MENGHITUNG BIAYA PERAWATAN. 32–45.

Arsyad Muhamad. (2018). MANAJEMEN PERAWATAN (Rahmadani). Grup Penerbitan CV BUdi Utama. https://books.google.co.id/books?id=jz5VDwAAQBAJ&printsec=frontcover&dq=Tujuan+pemeliharaan+mesin&hl=id&newbks=1&newbks_redir=0&sa=X&ved=2ahUKEwjc-pCpgtT9AhWv-zgGHV8rBxUQ6AF6BAgCEAI#v=onepage&q=Tujuan pemeliharaan mesin&f=false

B.B.Agarwal. (2010). Software Enginering Dn Testing. https://books.google.co.id/books?id=ZoF06z4dhQ4C&pg=PA110&dq=mttf&hl=id&newbks=1&newbks_redir=0&sa=X&ved=2ahUKEwjo3vPUmNn9AhW35XMBHfZSD3sQ6AF6BAgFEAI#v=onepage&q=mttf&f=false

Bernhardt, I. M. (2019). PENJADWALAN PREVENTIVE MAINTENNACE DI PT.WAHANA LENTER RAYA. SAE Technical Papers, 86–96. https://doi.org/10.4271/350068

Cahyani, O. D., & Iftadi, I. (2021). Penjadwalan Preventive Maintenance dengan Metode Reliability Centered Maintenance pada Stasiun Cabinet PU di PT IJK. Teknoin, 27(1). https://doi.org/10.20885/teknoin.vol27.iss1.art4

Dio, A. D., Mz, H., Tamalika, T., & Tridinanti, U. (n.d.). PENERAPAN METODE AGE REPLACEMENT PADA USULAN JADWAL PREVENTIVE MAINTENANCE MESIN DUMP TRUCK DI PT. BSE BAYUNG LENCIR. https://ojs.unpkediri.ac.id/index.php/noe

Dr.Ambarwati Rita.,S.E., M. MT. (2020). MANAJEMEN OPRASIONALDAN IMPLEMENTASI DALAM INDUSTRI. Pustaka rumah Cinta. https://books.google.co.id/books?id=HYgkEAAAQBAJ&pg=PT946&dq=PENGERTIAN+Penjadwalan+Maintenance&hl=id&newbks=1&newbks_redir=0&sa=X&ved=2ahUKEwix-siwkdT9AhWzSHwKHY0oCp8Q6AF6BAgHEAI#v=onepage&q=PENGERTIAN Penjadwalan Maintenance&f=false

Dr.Ir.Edison Siregar, M. M. (2017). Pengantar Manajemen dan Bisnis. CV.Widina Media Utama.

FATHUM, M. Pd. (2020). PEMELIHARAAN KELISTRIKAN KENDARAAN RINGAN. CV.Diandra Primamitra Media. https://books.google.co.id/books?id=HonwDwAAQBAJ&pg=PA4&dq=PENGERTIAN+Preventive+maintenance&hl=id&newbks=1&newbks_redir=0&sa=X&ved=2ahUKEwiWss62qNb9AhUUxjgGHdieAz0Q6AF6BAgDEAI#v=onepage&q=PENGERTIAN Preventive maintenance&f=false

I Nyoman Lokajaya. (2009). PENENTUAN WAKTU PENGGANTIAN KOMPONEN DAN BIAYA PENGGANTIAN YANG OPTIMAL PADA MESIN CRAWLER ROCK DRILL. 6,No.1, 32–40.

Ir.Hadi,Syamsul,M.T., Ph. D. (2019). PERAWATAN DAN PERBAIKAN MESIN INDUSTRI (D. Nofiyanto, Ed.; Arhadi). Perpustakan,Katalog dalam Terbitan (KDT).

Law, A. M. (2015). Simulation Modeling and Analysis, FIFTH EDITION. www.averill-law.com

Maukar, A. L., Lukmandani, A., & Santosa, H. (2011). Penjadwalan Perawatan di PT. Steel Pipe Industry Of Indonesia. Widya Teknik, 10(1), 103–116.

Meli Amelia, & Aspiranti, T. (2021). Analisis Pemeliharaan Mesin Conveyor Menggunakan Metode Preventive dan Breakdown Maintenance untuk Meminimumkan Biaya Pemeliharaan Mesin pada PT X. Jurnal Riset Manajemen Dan Bisnis, 1(1), 1–9. https://doi.org/10.29313/jrmb.v1i1.32

Ngadiyono yatin, M. Pd. (2010). Pemeliharaan Mekanik Industri. Universitas Negeri Yogyakarta.

Nurbani, S. N., Seftiadie, J., Prodi, ), Industri, T., Sangga, U., & Ypkp, B. (2019). ANALISIS PERBANDINGAN METODE PREVENTIVE MAINTENANCE DAN CORRECTIVE MAINTENANCE MESIN TENUN PADA DEPARTEMEN WEAVING DI PT. BANDUNG SAKURA TEXTILE MILLS. 1(1).

Prof.Dr.Djamil Masyhudsulhak. (2019). OPERASI DAN PROSES MANAJEMEN. Mitra Wacana Media.

Rahmanto, B., Setiawan, F., & Sofyan, E. (2022). Perancangan Aktivitas Pemeliharaan dengan Metode Reliability pada Sistem Main Rotor Blade Helikopter BELL 412EP Studi Kasus Penerbad Semarang. Journal of Applied Mechanical Engineering and Renewable Energy, 2(1), 9–15. https://doi.org/10.52158/jamere.v2i1.243

Yulius, H., Susanto, T., Industri, J. T., Tinggi, S., & Padang, T. I. (2020). USULAN BIAYA PREVENTIVE MAINTENANCE DENGAN MENGGUNAKAN METODE MODULARITY DESIGN PADA MESIN RIPPLE MILL DI PT. INCASI RAYA POM. Jurnal Sains Dan Teknologi, 20(2).

Downloads

Published

2023-06-17

How to Cite

Ridhwan Dwi W, & I Nyoman Lokajaya. (2023). Analisis Perawatan Komponen Chamber Box Pada Mesin Laminating Departemen Printing Produksi Kemasan Plastik (Studi Kasus:Pt.Daesang Ingredients Indonesia). Jurnal Kendali Teknik Dan Sains, 1(3), 92–106. https://doi.org/10.59581/jkts-widyakarya.v1i3.606

Similar Articles

<< < 1 2 3 4 > >> 

You may also start an advanced similarity search for this article.