Analisis Beban Kerja Pada Operator Mesin Vacum Geiss AG Menggunakan Metode Full Time Equivalent (FTE) Di PT. XYZ

Authors

  • Herry Dwi Prasetyo Universitas Pembangunan Nasional “Veteran” Jawa Timur
  • Iriani Iriani Universitas Pembangunan Nasional “Veteran” Jawa Timur

DOI:

https://doi.org/10.59581/jkts-widyakarya.v2i1.2426

Keywords:

Workload Analysis, Full Time Equivalent, Performance

Abstract

Workload analysis provides an opportunity to smooth workload or reduce work activities that do not provide added value. Detailed evaluation and analysis of each work element of a position will display a more detailed workload map. PT. XYZ requires detailed workload mapping to be able to display the load profile for each position. The results of this load mapping can be used for workload normalization analysis. This research uses the Full Time Equivalent (FTE) method. The data used in this research are job descriptions, frequency and working hours. The research results show that the FTE-based workload value of the Vacum Geiss AG operator is FIT (value 1-1.28), namely on 03-10-2023 it is 1.030 and on 04-10-2023 it is 1.030 which is fit because the FTE value is between The value is 1-1.28 so that the operator's work load is appropriate on that day, then on 05-10-2023 on the Geiss AG vacuum machine it is 0.915, it is still underload because the FTE value is below the value of 0.99 so the operator on that day is underloaded. the work is not suitable and additional work is needed.

References

Azam Hamad, Syahrum Agung, and Muhamad Azis Firdaus, ‘Pengaruh Beban Kerja Dan Stres Kerja Terhadap Prestasi Kerja Karyawan’, Manager : Jurnal Ilmu Manajemen, 3.3 (2020), 352 <https://doi.org/10.32832/manager.v3i3.3867>.

Eka Darmasari, ‘Pengaruh Beban Kerja Dan Stres Kerja Terhadap Produktivitas Kerja Karyawan CV.Sinar Utama Yamaha Kota Samarinda’, Jurnal Administrasi Bisnis FISIPOL UNMUL, 10.4 (2022), 296 <https://doi.org/10.54144/jadbis.v10i4.9190>.

Eka Putri Cahyanti, Khusnatul Zulfa Wafirotin, and Arif Hartono, ‘Penerbitan Artikel Mahasiswa’, Jurnal Ekonomi, Manajemen & Akuntansi, 3.1 (2019), 40–57.

Nurul Hudaningsih and Riki Prayoga, ‘Analisis Kebutuhan Karyawan Dengan Menggunakan Metode Full Time Equivalent ( FTE ) Pada Departemen Produksi PT. Borsya Cipta Communica’, Jurnal Tambora, 3.2 (2019), 98–106.

P Manoppo and others, ‘TERHADAP PRODUKTIVITAS KARYAWAN DI PT . EMPAT SAUDARA MANADO THE INFLUENCE OF WORKLOAD , WORK ENVIRONMENT AND INTEGRITY ON EMPLOYEE PRODUCTIVITY AT PT . EMPAT SAUDARA MANADO Jurnal EMBA Vol . 9 No . 4 Oktober 2021 , Hal . 773-781’, 9.4 (2021), 773–81.

Rygienia Matindas, Lery Fransil Suoth, Jeini Ester Nelwan, ‘HUBUNGAN ANTARA BEBAN KERJA FISIK DAN STRES KERJA DENGAN PENDAHULUAN Riset Yang Dilakukan The Conference Board Dalam Total Economy Database Mengungkapkan Pertumbuhan Kemampuan Pekerja Lebih Rendah Daripada Tuntutan Pekerjaan Maka Akan Muncul Kelelahan Yan’, 7.5 (2018).

Downloads

Published

2024-01-02

How to Cite

Herry Dwi Prasetyo, & Iriani Iriani. (2024). Analisis Beban Kerja Pada Operator Mesin Vacum Geiss AG Menggunakan Metode Full Time Equivalent (FTE) Di PT. XYZ. Jurnal Kendali Teknik Dan Sains, 2(1), 106–118. https://doi.org/10.59581/jkts-widyakarya.v2i1.2426

Similar Articles

1 2 3 4 5 6 > >> 

You may also start an advanced similarity search for this article.