[1]
Revi Lasmita and Mela Ardeline 2024. Earned Value Analysis Terhadap Waktu dan Biaya Pada Proyek Pembangunan Gedung Pasar Padang Panjang. Jurnal Kendali Teknik dan Sains. 2, 3 (Jul. 2024), 221–238. DOI:https://doi.org/10.59581/jkts-widyakarya.v2i3.3901.